The project consisted of the construction of a classroom and changing facilities block adjoining the main school building. Located on a very confined site, adjacent to the busy arterial route of the N11, this project was delivered while the campus was live, without disruption to the operation of the school or compromising the safety and health of it’s 800 no. students, staff or wider public.